Your current location: Home > New Energy > Secondary EPC for Centralized New Energy Stations
Secondary EPC for Centralized New Energy Stations
System framework


Supply principles
  • Rapid Supply
    Modular design of software and hardware, automated testing of single boards and complete machines, and a sound production management system
  • Cost Control
    Integrated equipment design, elastically scalable software, and highly integrated hardware functions
  • Two Rules Control
    Equipment selection follows the "Two Rules", grid operation management assessment, and auxiliary service management assessment
  • Comprehensive Products
    Zone I main equipment, Zone II auxiliary equipment, Zone IV smart inspection equipment
Cases
  • Tianjin Huadian Binhai Hangu 48MW green ecological hybrid PV power generation project
  • Jidong Oilfield self-consumption PV power generation project
  • Guodian Chengde Weichang 100MW PV-energy storage integrated project
  • Datang Huayin Hengnan County Huangji 50MW forestry-PV complementary power generation project
  • Xinjiang Oilfield Company Baijiantan 2022 50MW guaranteed grid-connected power generation project
  • Northwest Power Materials Co., Ltd. Binzhou Longyuan Dafosi 50MW agriculture-PV complementary power generation project
  • Shandong Gaomi Jiaohe Ecological Development Zone agriculture-PV complementary power station 100MW integrated automation system